Lightly scratch a vertical line on the surface with the rear of the blade to mark the length of your shed plus the front and rear overlaps.
Lines on roofing felt.
Remember to leave a 2 overlap.
This video walks through the very basic steps for installing tarpaper felt.
Why use roofing felt paper.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
This was a great value and a great product.
Align this layer with the bottom of the roof.
Overlay a second layer of felt 2 to 3 inches and fasten it through the overlay so it secures the top of the felt underneath.
Scratch a line between the two marks to create a vertical guide for your cut.
If you use the lines as guides for installing shingles measure up from the drip edge to confirm that you stay parallel.
Mark the same at the other end of the roll.
The bottom of the second course of felt should be on top of the first course so that any moisture will flow over the layers of felt.
Overlap felt courses at least 4 inches.
In northern climates ice or snow dams are another common.
The roofing felt should be applied in layers that overlap.
Chalk lines should be snapped 33 5 8 above the eave line.
I especially appreciate the pre made lines on it that makes it very easy to line up your other pieces.
Setting the roll and then nailing off.
Starting a roof with tarpaper felt.
Roll out a few feet of felt and align the edge of the felt along the rake and the first course.
Item 656632 model 0903000.
It provides backup protection in the event of ice or water damage.
Snap a chalk line the.
Also called roof felt or builder s felt overlapped tar paper creates a water barrier that is your home s last line of defense against the elements if your shingles are damaged by wind hail or.
It went down easily.
Wind driven rain or snow can trap water under your shingles putting your roof deck and inner residence at risk of moisture.
Roll out the felt eliminating creases or bubbles and drive at least three staples every foot.
Unroll your felt onto a flat surface.
After this lines should be snapped every 34 as you move up the roof.
Snap a chalkline 32 inches above the top edge of the wsu or use the lines on the felt as guides.